City of Fredericktown IDA

Amenities

Natural Gas
Two 10” pipelines are on site in our Industrial Park.

Electricity
Two 15-megawatt natural gas-driven turbines.
7,200 volt, 3 phase power with guaranteed uninterupted electrical power. Service will be available March 2012.

Water
2.1 million gallons per day.
Current use is 440k gallon per day.
Three water storage tanks with 1.3 million gallon capacity.

Data and Voice Transmissions
AT&T fiber optic pipeline.

Air
4,000-foot runway with dry storage facilities on site.

Motor Freight
4-lane highway access at site; arterial highways connecting north to south and east to west.

Copyright © 2011 City of Fredericktown Industrial Development Authority. All rights reserved.